Project
Details:
Project included the designing and installation
of 40,000 sf of vertical foam panels as well
as miscellaneous steel framing along with a 510
ft aircraft rolling door system.
Client:
Mystic Aquarium
Mystic, CT
Designer: Cesar Pelli Architects
Contractor: Turner Construction Co.
Project
Details:
Project consisted of 37,000 sf of metal wall
panels. Dark blue panels at bottom and light
blue panels at top are vertical foam panels.
Green panels at right are vertical ribbed panels.